About the project

  • Date: ongoing
  • Client: Various clients
  • Category:
  • Location: Croatia
For many Clients we have performed Grid connection elaborates for power plants which are required by Croatian grid code in development and in construction phase. Toska is authorized by HEP ODS (Croatian DSO) to perform grid connection studies in project development (EMP, EOTRP). We have also performed many elaborates required for grid connection of roof-top and ground mounted solars (EUEM, EPZ, OPIP). In total we have performed grid connection studies for over 200 MW of solar power plants.

Toska services

List of elaborates we can do for your project, size from hundreds of kW up to hundreds of MW:

  • Preliminary grid connection point elaborate (EMP)
  • Elaborate of optimal technical solution of grid connection point (EOTRP)
  • Elaborate of plant grid impact (EUEM)
  • Relay proception coordination elaborate (EPZ)
  • Grid compliance test elaborate (OPIP)
  • Power quality measurement and report