WHAT WE DO
We help deliver energy to the world.
Engineering
Consulting
Power System Engineering



Solar
Wind
Geothermal
Grid connection studies
WHAT WE DO
We Create Green Energy
for Everyone
Toska is certified by grid operator to perform grid connection studies.View all Service
TECHNICAL CONSULTING
Do you want to invest in renewable energy in Croatia and region?
OUR REFERENCES
We worked on some interesting projects

SPP Dub Bibinje 34 MW
Construction of SPP Dub Bibinje 34 MW solar power plant in Croatia is part of Adris Grupa and Encro cooperation.

SPP Tijarica & Tarabnik 50 MW
Construction of SPP TIjarica Tarabnik 50 MW solar power plant in Croatia is part of Adris Grupa and Encro cooperation.

WF Visoka 53 MW, Croatia
WF Visoka 53 MW wind power plant in Croatia is part of Adris Grupa and Encro cooperation.

Wind Farm Senj 156 MW, Croatia
WF Senj 156 MW wind power plant, one of the biggest wind farms in CEE, biggest wind farm in Croatia.

Grid connection 110kV Knauf Insulation, Croatia
As part of investment in new production line, Knauf is constructing new grid connection to 110 kV grid.

Solar power plant near Sibenik 100 MW, Croatia
Project development services including technical consulting, design, engineering, permitting

Solar power plant near Drnis 14MW
Project development services including technical consulting, design, engineering, permitting

Grid connection elaborates, Croatia
Grid connection elaborates for power plants which are required by Croatian grid code in development and in construction phase.

Grid compliance for Kronospan 110 kV consumer, Croatia
Due to planned expansion of production facility in Bjelovar, Croatia, it was required to change power supply and connect to 110 kV TSO grid.

Solar power plant 100 MW, Catania, Italy
Development of 100 MW solar power plant portfolio in region near Catania, Italy.

Solar power plant Satnica 17 MW, Croatia
Prepared documents required by Croatia permitting process for obtaining Energy Approval

Goethermal power plant Velika Ciglena 16,5 MW, Croatia
The geothermal power plant Velika Ciglena 16.5 MW – is first (and currently only) geothermal power plant in operation in Croatia.