About the project

  • Date: Ongoing
  • Client: Norinco International Cooperation / Energija Projekt, China
  • Category:
  • Location: Senj, Croatia
Owner's engineer services during construction of WF Senj 156 MW wind power plant, one of the biggest wind farms in CEE, biggest wind farm in Croatia. With total project investment aprox EUR 200 million. The project includes construction and installation of 39 wind turbines 4 MW class, 220/x takeoff substation, 220 kV overheadline length 10km and construction of grid connection point at 220 kV in SS 220/35 kV Brinje. The Senj wind farm is the most significant Chinese investment in Croatia after constructing the Pelješac bridge. The wind farm trial run was official opened by Croatian Prime Minister Andrej Plenković, putting the project in the wider context of the relations between Croatia and China.

Toska Scope

Toska scope of services for WF Senj 156 MW was to perform full Owner’s engineer services during project construction. This includes project and quality management of construction works and equipment control, stakeholder management with government institutions regarding permitting, management of grid connection agreement, internal technical control (FAT, SAT, PAC), regular reporting, trial run, environmental monitoring.

  • Owner's engineer
  • Technical consulting
  • Project and Quality management
  • Engineering supervision (design approval, works approval, FAT, SAT, PAC, lead internal technical inspections etc.)
  • Grid connection management - Grid connection agreement, Grid usage agreement, TSO
  • Preparation of documents for technical inspections, investor representative during technical inspections